Soundcraft achieves further success in testing dual orientation primary tested door sets
Due to the failure of some (non-timber) doors when tested, either opening towards or away from the furnace, The Government has suggested that all doors should be dual orientation tested. Progressing these new industry standards, Soundcraft door sets have successfully passed dual orientation testing at Warrington Fire, opening both in and away from the furnace,
Impressive results at Robert May’s School
Continuing our strong track record of successful local authority projects, Soundcraft has completed the design, manufacture and installation of high-performance doors, windows and curtain walling at Robert May’s Secondary School in Hampshire. Working with Morgan Sindall Construction on the school expansion project for Hampshire County Council, Soundcraft was appointed to provide bespoke products for durable
Berry Court project wins Best Housing Scheme award
We are hugely proud to be part of the outstanding Berry Court residential project – winner of Best Housing Scheme at the 2019 Planning Awards. As one of the largest new-build residential contracts undertaken by Soundcraft to date, work on the 10-storey Berry Court scheme in Bournemouth involved the design, manufacture and installation of 450 aluminium
A great day at the races
Celebrating successful partnerships and excellent achievements this year, Soundcraft’s Managing Director Robert Thomson takes a client group to the Epsom Oaks and meets two-star Michelin chef extraordinaire, Michel Roux – conveniently situated by the winning post! Main picture L-R: Tim Maddison-Ward, County Security; Rob Gallagher, Stratton & Hessler; Soundcraft’s Dominic Chugg and Robert Thomson; Jon Fellowes and
Soundcraft’s timber-frame loft hatch achieves fire rated approval
As part of our continual product development and proactive industry testing, Soundcraft has manufactured a timber-framed loft hatch to meet fire rated regulations for the construction sector. The Soundcraft Loft Hatch was successful tested for 30 minutes to provide evidence utilising the temperature and pressure conditions of BS 476: Part 20 and principles of Part
Going the distance for O2e
There’s over two weeks to go before the 2019 Thames Path Challenge for O2e – so it’s not too late to join us! Members of the Soundcraft team will be putting their best foot forward in a challenging charity walk to help raise vital funds for children with disabilities and life-threatening illness. O2e Ambassador Sue Smith said